Description
Blickman Mayo stands with a 12-5/8" x 19-1/8" stainless steel tray and the Tru-Loc™ friction knob height adjustment. This listing covers the single-post stainless steel Newark family (Lightweight, Standard, Four Caster and MR Conditional) and the double-post chrome 1510.
Newark Single-Post Stainless Steel
- Lightweight 1520SS: two-pronged lightweight stainless steel base with two hard rubber back casters
- Standard 8841SS: two-pronged stainless steel base with two roller blade back casters
- Four Caster 8848SS: two-pronged stainless steel base with four roller blade casters
- 8841MR: MR Conditional version of the Standard Newark, with MR Conditional casters
Double-Post Chrome 1510
- Double-post chrome Mayo stand with stainless steel tray
- Chrome loop base with two 2" twin-wheel hooded back casters
All Models
- 12-5/8" x 19-1/8" stainless steel tray
- Tru-Loc™ friction knob height adjustment
Models
| Model | Item # | Description | Height Adjustment |
| 8841SS | 0638841000 | Newark Standard, stainless steel | 39-1/2"–62" |
| 8841MR | 0638841200 | Newark Standard, MR Conditional | 39-1/2"–62" |
| 8848SS | 0648848000 | Newark Four Caster, stainless steel | 39-1/2"–62" |
| 1520SS | 0671520000 | Newark Lightweight, stainless steel | 37-1/4"–64" |
| 1510 | 0661510000 | Double-post chrome | 34-1/2"–54" |
Specifications
| Specification | Detail |
| Tray | 12-5/8" x 19-1/8" stainless steel |
| Height Mechanism | Tru-Loc™ friction knob |
Resources
- Blickman Mayo Stands catalog (PDF)
- Blickman MR Conditional products catalog (PDF)
- Blickman Newark Mayo Stand
- Blickman MR Conditional Mayo Stand
- Blickman Double Pole Chrome Mayo Stand
Shipping: Ships direct from Blickman in Clifton, NJ (FOB Clifton, NJ). Items over 100 lb ship by LTL freight, with dock-to-dock or liftgate delivery chosen at checkout. Contact us for freight to Alaska, Hawaii or outside the contiguous US.
Pricing: Contract and volume pricing available, including Vizient and Provista. Add this item to your quote for multi-unit pricing, freight and current lead time.





